A 6,500 m² steel-frame warehouse with 12 loading docks and a two-storey office.

A regional logistics company needed a new hub before peak season. We built a 6,500 m² warehouse with a 12-metre eaves height, 12 loading docks and a two-storey office.

The power-floated slab was poured in six days, and the building opened on the agreed date.

How the job ran

  1. Month 1Site clearance and piling
  2. Month 2Slab and drainage
  3. Months 3–4Steel frame and cladding
  4. Months 5–6Docks, offices and services
  5. Month 7Yard, testing and handover